Data Center Construction Quality Assurance Manager
Company: Worldwide Mission Critical
Location: Chantilly
Posted on: April 1, 2026
|
|
|
Job Description:
Worldwide Mission Critical is a global owner's representation
and project management company dedicated to the mission-critical
industry, helping companies deliver their data centers on time and
under budget. Founded on the principle that the right team of
experienced data center professionals will deliver great projects,
our ability to provide oversight for all aspects of a project sets
us apart. Summary Data Center Construction Quality Assurance
Manager (QA) will act as Owner’s Representative for mission
critical data center projects. QA will work alongside owner,
project managers, project engineers, general contractors, trade
partners, equipment vendors, design and engineering consultants,
and commissioning agents to assure that all installed product meets
or exceeds the intent of the contract documents, as well as
industry accepted standards for mission critical construction.
Primary Responsibilities Develop and maintain project-specific
Quality Assurance Quality Control (QA/QC) Plan inclusive of
Preparatory Meetings, First of Kind Inspections, Corrective
Actions, and Final Inspections. Thoroughly understand all project
documentation including drawings, specifications, RFIs, submittals,
shop drawings, equipment data sheets, and material safety data
sheets (MSDS). Perform cadenced inspections on all installed
product to ensure that it meets or exceeds the intent of the
contract documents. Report quality deficiencies to the General
Contractor and trade partners via the project’s adopted software
platform. Drive all documented quality issues through corrective
actions and closure authoring Root Cause Analyses (RCA) when
required. Continually audit systems installation to ensure that the
key geometries, dimensions, and pathways conform to the Building
Information Model (BIM). Partner with General Contractor and trade
partners on site logistics planning and material staging to drive
greater efficiency on the site. Lead weekly quality control
meetings with General Contractor and trade partners. Provide daily
quality summaries and more detailed, weekly reports to Owner.
Verify that all materials and equipment delivered to the project
conform to the approved submittals, free of damage, safely
stored/protected, and acceptable for use. Maintain log of all
inspections by the Authority Having Jurisdiction (AHJ). All failed
inspections are to be rectified. Participate actively and directly
in the development and maintenance of a strong safety culture. Act
as liaison between General Contractor, trade partners, equipment
vendors, owner operations, and commissioning agents (CxA)
throughout entirety of commissioning phase. Track all project
design changes and ensure that they are accurately captured in
appropriate as-built documentation and BIM files. Support project
management team on monthly applications for payment to ensure that
percentage of work installed in the field matches that which has
been billed. Sustain a culture of open communication, transparency,
and mutual respect and understanding between all project
stakeholders. Requirements Bachelor’s degree in Electrical
Engineering, Mechanical Engineering, or Construction Management
preferred. 10 years of relevant work experience in quality
assurance or quality control role in data centers or similar
mission critical build typologies. OSHA 30; First Aid/CPR; or able
to obtain within first 90-days of hire. CDCP highly preferred, but
not required. LEED AP highly preferred, but not required.
Familiarity with local and national building codes including NFPA,
NEC, IBC, general life safety and egress. Robust proficiency in
construction management software platforms such as Procore,
BlueBeam Revu, and Autodesk Cloud. Strong general computing skills
with a focus on Microsoft Office Suite (Word, Excel, PowerPoint,
Project, and Outlook.) Uncompromising commitment to safety. High
levels of initiative, self-direction, and attention to detail.
Ability to work in a close team environment. Ability to motivate
Contractor with solid communication skills and contract knowledge
to accomplish Owner and project goals. Ability to direct
troubleshooting and resolution of highly complex or unusual
construction problems. Capable of planning and organizing internal
and external resources. Problem analysis. Willingness to take on
responsibilities with a commitment to perform. Flexibility.
Problem-solving. Decision-making. Excellent communication and
interpersonal skills. Willingness to travel.
Keywords: Worldwide Mission Critical, Alexandria , Data Center Construction Quality Assurance Manager, Science, Research & Development , Chantilly, Virginia